乙方:
甲方在 路建造(加层)房屋一栋,框架共三层。预计建筑面积 平方米,采用包工形式由乙方泥木共同承建,为确保工程质量,根据建筑法规定,经甲方乙双方协商民,达成以下条例:
一、确保工程质量,泥木施工时互相配合,确保进度和质量,做到模板平整,柱子垂直,墙体平整垂直。
二、施工范围:木工自带模板、铁钉等材料。 泥工:做墙、粉刷、扎钢筋、浇水泥等。
注:(四周做墙)内、外粉刷,卫生间墙体及粉刷,不粉刷天棚、楼面、楼梯子。(商品水泥)
三、付款与结算方式:
浇完一层楼面,甲方预付泥工本层70%,墙面粉刷完,付20%,全部结束再付清10%,木工付本层的90%,房屋结束后,按房屋的投影建筑面积,泥工按每平方米 元计算,木工按 元/平方米计算。
四、建筑施安全
乙方应要求施工人员安全施工,如因施工人员违反建筑
五、每层浇水泥时甲方应结乙方每人补助中餐生活费20元,伙食由乙方自理。
六、未尽事,双方本着友好原则协商解决。
七、本合同一式叁份,甲乙双方各执一份,双方签字后生效。
乙方: 泥工:
年月日:
木工:
yacht build agreement
dated: 22nd december 20__
between
aaa‘s yacht company limited, hong kong. (hereinafter referred to as “the builder”)
and
bbb cc, vietnam, (hereinafter referred to as “the buyer”)
whereas:
1) the buyer wishes to acquire a aaa‘s cape 65 trawler yacht (the yacht) designed by thanos condylis, and built to the buyer’s stated requirements and specification, and the builder has the capability, knowledge and skills to build and supply the same.
2) the builder has agreed to construct, equip, fit-out, test and deliver the yacht to the buyer‘s stated requirements and specification, which the buyer has agreed to accept upon the terms and conditions here in after specified:
now therefore the parties hereto have agreed and do hereby agree as follows:
article i - interpretation
1) in this contract the following words and expressions shall have the meaning hereby ascribed to them, except where the context otherwise admits or requires:
“banking days” shall mean days upon which hong kong clearing banks are customarily open for business.
“the builder‘s clarifications” shall mean the documents so entitled forming part of this contract and set out as annexes hereto; (see also item (2) of this article.)
“buyer‘s representative(s)” shall mean such persons notified from time to time by the buyer as having authority to act for the buyer, the extent of such authority being set out in the notice;
“items of buyer‘s supply” shall mean any item of equipment and stores for the yacht ordered by the buyer direct from the manufacturer or the supplier, for incorporation in the yacht by the builder;
“items of builder‘s supply” shall mean any item of equipment and stores for the yacht ordered by the builder direct from the manufacturer or the supplier, for incorporation in the yacht;
“the certifying / survey body” shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer.
“the contract” shall mean (a) this contract, and (b) the attached annexes and schedule more particularly described below.
“the contract delivery date” shall mean no later than 30 june 20__;
“the contract master programme” shall mean the programme for construction of the yacht, set out in annex d;
“the contract price” shall mean the price stipulated in article v for the yacht, yard number 005;
“the yacht” shall mean the yacht the subject of this contract and generally as described in article ii, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but excluding the items of buyer‘s supply.
“the boatyard” shall mean aaa‘s yacht company, xinhui, china.
“the design specifications” shall mean the specifications, designs, plans and drawings, set out in schedule a, prepared and signed by the buyer, identified as forming part of this contract, and including such revised or supplemental specifications, plans and drawings as may subsequently be agreed between the buyer and the builder provided that (i) in the case of any inconsistency between any article or paragraph of this contract and the design specifications, this contract shall prevail, (ii) in the case of any inconsistency between the design specifications and a plan or drawing, the design specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing and another plan or drawing, the later in date shall prevail;
\"schedule a\" shall mean the agreed schedule of drawings
“annex a” shall mean the list of materials, components and equipment defining a completed yacht;
\"annex b\" shall mean the agreed weld quality procedures
“annex c” shall mean the agreed shot blasting, fairing, painting and foaming specifications
\"annex d“ shall mean the agreed production schedule master program.
“specified” shall mean stipulated in the specifications and annex a;
“supplier” shall mean any person, firm or company, which has entered into a contract with the builder for the s …… 此处隐藏:27393字,全部文档内容请下载后查看。喜欢就下载吧 ……