基坑变形监测及其数据处理方案(2)

时间:2026-01-16   来源:未知    
字号:

Abtract

This design is mainly for a deep foundation pit during the construction of foundation pit deformation and cause the deformation of the surrounding environment monitoring methods and data processing program design and analysis.The main monitoring content of the foundation pit wall for monitoring horizontal displacement and settlement monitoring;In support of lattice column for subsidence monitoring; near an excavation foundation pit surrounding by effect of buildings for subsidence monitoring;The surrounding building settlement of super early warning value requirements of the tilt observation.The monitoring method for precision two level, the polar coordinate method, points method,And its feasibility was made precision analysis.

Keyword: Horizontal displacement observation; settlement observation; tilt observation; two level; polar coordinates

基坑变形监测及其数据处理方案(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:19 元/月 原价:99元
低至 0.1 元/份 每月下载300
全站内容免费自由复制
VIP包月下载
特价:19 元/月 原价:99元
低至 0.1 元/份 每月下载300
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)