海上平台常用英语
271. Run the BOP and risers. 下防喷器和隔水管
272. Pick up the marine riser. 吊出隔水管
273. Pick up the slip joint. 起伸缩节
274. Adjust the riser tensioners. 调整隔水管张力
275. Function test the diverter system. 对防喷器系统进行功能测试
276. Retrieve the pin connector. 取出销钉连接器
277. Move the BOP to the moonpool door. 将防喷器移到园井甲板的活动门上 278. Run the test plug. 下试压塞
279. Close the upper pipe ram. 关上部钻杆闸板防喷器
280. Open the kill line valve. 开压井管线阀
281. The compensation capacity is 400000 pounds. 补偿能力是400千磅 282. The locking load is 1000000 pounds. 锁紧负荷1000千磅
283. Support the riser. 接隔水管支撑环
284. Remove the hose bundles. 卸下垮接软管
285. Assure the self-controlled rotation. 保证自控转动
286. Set the LMRP on the test pump. 将下部防喷器插入总成座放到试压桩上 287. Connect the flex joint to the riser. 连接隔水管与挠性接头
288. Land the BOP onto the well head. 座防喷器到井口头
289. Run the subsea TV for monitoring. 下水下电视观察
290. Remove all the riser running tools. 取出所有的隔水管送入工具 291. BOP carrier. 防喷器叉车
292. Lower the universal guide frame. 下放万能导向架
293. Paint mark the top 6 meters of 30” conductor white. 在30”隔水管的顶部6
米处用白漆涂上记号
294. Check adequate length for guidelines. 检查导向绳的长度是否足够 295. Move temporary guide base (TGB) into moonpool. 将临时导向基板到园井
甲板
296. Test pull to check connection. 试拉检查连接
297. Grease TGB and running tool as required. 按要求给导向基板及下入工具
上黄油
298. Test fit TGB and running tool. 用下入工具试临时导向基板连接 299. Check for junk inside shoe joint. 检查浮鞋内有无落物
300. Pick up 30” conductor handling slings and shackles. 吊上下30”导管的索具
和卸扣
301. Is slope indicator properly mounted? 水平仪是否装好?
302. Ensure subsea TV is in good condition. 确保水下电视处于良好的状态 303. Place BOP stack on the test pump. 将防喷器组放在试压桩上
304. Check condition of all 30” casing connectors. 检查所有30”套管接头的情
况
305. Replace O-rings as required. 按需要, 更换O性密封圈
306. Attach slope indicator below camera position. 在摄像机下面装上水平仪 307. Inspect and repair diverter. 检查并修理转喷器