Design and Evaluation of Tailings Dams

TABLE OF CONTENTS1. INTRODUCTION ................................................................ 1

2. OVERVIEW OF TAILINGS DISPOSAL .............................................. 3

2.1 Methods for Tailings Disposal ................................................... 4

2.2 Types of Impoundments ........................................................ 5

2.2.1 Valley Impoundments ................................................. 7

2.2.2 Ring-Dike Impoundments .............................................. 12

2.2.3In-Pit Impoundments.................................................. 14

2.2.4 Specially Dug Pit Impoundment Design ................................... 14

3. TAILINGS IMPOUNDMENT DESIGN ............................................... 15

3.1 Basic Design Concepts ......................................................... 15

3.2 Design Variables .............................................................. 17

3.2.1 Tailings-Specific Factors ............................................... 17

3.2.2 Site-Specific Factors .................................................. 18

4. EMBANKMENT CONSTRUCTION, STABILITY, AND FAILURE ....................... 22

4.1 Embankment Construction ...................................................... 22

4.2 Construction Methods .......................................................... 23

4.2.1 Construction Using Tailings Material ..................................... 23

4.2.2 Upstream Method ..................................................... 25

4.2.3 Downstream Method .................................................. 26

4.2.4 Centerline Method .................................................... 28

4.2.5 Embankments Constructed Using Alternative Materials ...................... 30

4.3 Tailings Deposition ............................................................ 30

4.3.1 Single Point Discharge ................................................. 30

4.3.2 Spigotting ........................................................... 31

4.3.3 Cycloning ........................................................... 31

4.4 Stability Analysis .............................................................. 33

4.4.1 Flow Net Analysis .................................................... 34

4.5 Failure Modes ................................................................ 36

4.5.1 Rotational Sliding ..................................................... 36

4.5.2 Foundation Failure .................................................... 37

4.5.3 Overtopping ......................................................... 37

4.5.4 Erosion ............................................................. 37

4.5.5 Piping .............................................................. 37

4.5.6 Liquefaction ......................................................... 38

4.6 Performance Monitoring ........................................................ 38

5. WATER CONTROL AND MANAGEMENT .......................................... 40

5.1 Surface Water ................................................................ 40

5.1.1 Surface Water Evaluation .............................................. 40

5.1.2 Surface Water Controls ................................................ 42

5.2 Tailings Seepage .............................................................. 43

…… 此处隐藏:1372字,全部文档内容请下载后查看。喜欢就下载吧 ……
技术报告-尾矿库设计及评估 (英文)(3).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
×
二维码
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)